top of page

Duhamel Lane
New build of 3 Flats.
This was an inhouse development on a site that had been the JMEC store. The 3 storey building was erected in three weeks in spite of there being very limited space. Each of the flats has its own individuality with the top flat having sole use of a roof terrace . The flats were all sold during 2024.
Project Gallery



bottom of page